
Compare the working stages
Record simultaneous workers and shift overlap, not only the number employed on the job. Identify whether separate work areas need their own facilities. The site team remains responsible for assessing applicable workplace requirements; equipment hire alone is not a compliance determination.
Reserve a serviceable position
Ask the site supervisor to review the proposed units alongside material storage, vehicle movements and fencing. Leave a usable pedestrian route and a separate handling approach. If the next construction phase will remove that approach, arrange review before it happens.
Include washing and user needs
Standard cabins are a starting option, with accessible provision and washing considered on their own merits. Confirm features for the actual model. A larger quantity does not replace the correct type of equipment.
Give changes an owner
Name the person who receives delivery, reports low supplies and requests changes. Agree duration, servicing and collection, including who maintains access after the main crew leaves. Ask about extension terms before assuming the order continues unchanged.